Elm Creek Public School

Elm Creek Public School

Addition 44,380 square feet

The Board of Education debated building an all-new school or renovating the existing elementary school, which had served the community well for 100 years. Ultimately, the most cost effective solution was a new, two-story elementary school connected to the existing 7-12 building, as well as renovations to the 7-12 facility.

The project included adding a multipurpose room that could be used by all Elm Creek students and is also available for community youth sports practice and other activities. In addition to the physical transformation, the building has received significant mechanical, electrical and special systems upgrades.

Project Delivery Method

Construction Management

Project Scope

Addition to and renovation of a school:

  • PK-6 classrooms
  • Elementary commons
  • Quiet room
  • Break out space
  • Multipurpose room
  • Administrative spaces
  • Weight room
  • Elevator
  • Career and Technical Education lab for construction, welding and metals

Saint Cecilia High School

Saint Cecilia High School

The addition and renovation at Saint Cecilia High School elevates the student experience by creating a modern, inspiring learning environment for students.

Key Features:
  • Secure and Welcoming: A state-of-the-art secure entrance ensures student safety.
  • Spiritual Haven: A stunning, two-story chapel with a serene prayer wall fosters spiritual growth.
  • Innovative Learning Spaces: A cutting-edge science room and renovated classrooms inspire academic excellence.
  • Collaborative Hub: A spacious, light-filled courtyard provides an outdoor oasis for students to connect and learn.
  • Efficient Administration: New administrative offices streamline operations.

Square Feet

Addition: 10,617 | Renovation: 38,353

Wilcox-Hildreth Public School

Wilcox-Hildreth Public School

Addition 26,244 square feet | Renovation: 1,572 square feet

BD Construction constructed two additions to the Wilcox-Hildreth School while school remained in session. Through phasing, staff was able to move into the east addition before school started in the fall of 2020. The second addition was complete in December 2020.
The additions to and renovations of this school included a new main academic entrance with secure vestibule, new administrative offices, staff workroom, secure reception area, and classrooms. Construction of an addition to the north created a new competition gym, locker rooms, new commons/cafeteria and a new kitchen.

Project Delivery Method

Construction Management

Project Scope

Addition to and renovation  of a school:

  • Classrooms
  • Kitchen
  • Commons
  • Locker Rooms
  • Secure Entry
  • Concession Stand
  • Administrative Spaces

Osceola Public Schools

Osceola Public Schools

SQUARE FEET

Renovation: 1,572 | Addition 26,244

PROJECT SCOPE

Construction of a school:

  • Classrooms
  • Kitchen
  • Cafeteria
  • Gymnasium
  • Locker rooms
  • Early childhood suite
  • Commons
  • Secure main entrance for elementary
  • Administrative offices for elementary

Elwood Public Schools

Elwood Public Schools

Square Feet

Renovation: 4,175  | Addition 2,660

Project Scope

  • Well-defined main entrance with security features
  • New administrative offices
  • Commons space with clerestory windows for natural light
  • Concessions
  • Multi-function space outside the gym

Kearney High School

Kearney High School

PROJECT DETAILS

  • All new high school
  • Small Learning Communities approach
  • Successful bond issue
  • BD Construction served as the Owner’s Representative

FEATURES INCLUDE

  • Classrooms accommodate 1,750 students
  • Collaborative educational spaces
  • Expanded wrestling and weight room with new locker rooms
  • 1,000-seat performing arts center
  • 2,000-seat competition gymnasium
  • Competition swimming facility
  • Football field and track

Shelby-Rising City Public Schools

Shelby-Rising City Public Schools

This school renovation and addition encompassed a classroom wing; new gymnasium, locker rooms and fitness center; commons area; kitchen addition and renovation; building security upgrades; and cosmetic, HVAC and electrical improvements to existing spaces. Shelby was able to add a science room and more exterior paving as a result of cost savings BD identified. Since the renovation and addition spanned a school year, BD Construction worked with school leaders to modify and adapt rooms for use as each area was completed so that other areas could be renovated for their final purpose.

Addition: 61,320 square feet | Renovation: 76,130 square feet

  • Addition of 12 elementary classrooms
  • Space for preschool
  • New gymnasium and locker rooms
  • Fitness center that is also open to the community
  • FFA shop, science room
  • New football field and track
  • New HVAC, renovations throughout
  • Secured entrance and other safety features

(stellardental.my)

Horizon Middle School

Horizon Middle School

PROJECT DETAILS

  • Kearney, Nebraska
  • Renovation to current Horizon Middle School site

FEATURES INCLUDE

  • Addition of six classrooms
  • 60 percent of building being renovated
  • All new HVAC, electrical and fire sprinklers

Pleasanton Public Schools

Pleasanton Public Schools